BobSokol.com_logo


Bob & Cheryl buy a Lake House.

Before we can start construction we'll have to have a little demolition.

All of the fixtures and appliances that came with the place are junky. We'll be stripping the place to the walls. Here's the kitchen area.

Lakehouse


The cabinets came from the UT chemistry department during a remodel. They'll be leaving shortly.

Lakehouse


The sink enclosure is 1950 style metal and like everything else it was removed from somewhere else and reinstalled here.

Lakehouse


The wall behind the cabinet is perforated with through holes drilled over the years for pipes, cable, phone, electrical.

Lakehouse


and the floor tiles have to be scraped up by hand.

Lakehouse
Click on this picture to watch a short movie of me
knocking off a couple of easy tiles:


We'll be installing all new plumbing - inside the walls rather than along the floor - so everything must go.

Lakehouse


The easiest thing to do is shoot a line and slice the sheetrock even so it will be easy to replace.

Lakehouse


And ready to build fresh.

Lakehouse

CLICK HERE GO TO THE NEXT LAKEHOUSE PAGE

CLICK HERE GO TO THE PREVIOUS LAKEHOUSE PAGE

Return to BobSokol.com